4,500.00

DETAILED REPORT ON THE CONSTRUCTION

Accounts Reports

CE08-WATER SUPPLY SCHEME

2,000.00

OVERVIEW, SYSTEMS OF WATER SUPPLY, GENERAL STRUCTURE OF THE SYSTEM, PRODUCTION SYSTEM

2,400.00

INTRODUCTION, PRELIMINARY DESIGN, MANUAL DESIGN, ANALYSIS AND DESIGN OF SUPER STRUCTURE BY STAAD, DESIGN OF FOUNDATION, CONCLUSION

2,300.00

Introduction, plant location selection, orientation, cost analysis, the site plan, requirement & guidelines, structural design, design of outer area, design of foundation

1,550.00

Detailed report on construction of a highway road.

Civil Engg. Reports

CE03-CONSTRUCTION OF MALL

4,800.00

Detailed report on construction of mall.

4,500.00

CE01-CONSTRUCTION OF HOTEL BUILDING

1,500.00

CONSTRUCTION OF BUILDING - Types of construction projects, Design and build, Management procurement systems, Residential construction, Heavy/Civil construction, Industrial construction, Perfect buildings